Omega Project
-
noviembre/2008
-
noviembre/2008
-
septiembre/2009
-
abril/2010
-
octubre/2011
-
enero/2012
-
febrero/2013
-
noviembre/2016
-
enero/2017
-
enero/2017
-
julio/2017
-
noviembre/2017
-
diciembre/2017
-
julio/2018
-
julio/2018
-
julio/2018
-
julio/2018
-
julio/2018
-
julio/2018
-
THE OMEGA PROJECT IS BORN
The idea of a large-scale project that generates the synergies of technological reconversion with the growing demand for caustic soda in the national market, driven by the installation of cellulose manufacturing plants and the consequent increase in productive capacity.
-
IT IS PROCESSED AND OMEGA PROJECT IS COMPLETELY DESIGNED BY EFFICE TECHNICIANS, WITH CPA ASSISTANCE IN THE FINANCIAL ASPECTS.
The Omega project is conceived as a project of technological reconversion and modernization, expansion of productive capacity and production of new products, which makes the chloro-soda production equation viable.
-
PRESENTATION TO COMAP.
The project for the study of COMAP and the granting of tax exemptions is presented.
-
SIGNING OF THE DECREE OF THE EXECUTIVE BOARD DECLARING THE OMEGA PROJECT OF NATIONAL INTEREST BY MIEM.
The investment presented by Efice for the execution of the Omega Project by the MIEM and the MEF is declared promoted.
-
SIGNING OF DECREE WITH DECLARATION OF NATIONAL INTEREST AS EXTENSION OF THE PREVIOUS ONE.
The expansion of the investment presented by Efice for the execution of the Omega Project by the MIEM and the MEF is declared to be promoted.
-
CREATION OF THE DEPARTMENT OF INNOVATION DIRECTED BY A CHEMIST WITH 42 YEARS IN EFFICE.
The Innovation Department is created with the purpose of generating new products derived from chlorine in order to optimize the placement of chlorine in value-added products, allowing to increase the productive capacity given that the caustic soda has guaranteed demand.
-
ENVIRONMENTAL REPORT SUMMARY EFICE.
The summary environmental report is presented, whose objective is to present clearly and succinctly the summary of the environmental impact study carried out for the Special Environmental Authorization Request.
-
LAUNCH PROJECT OMEGA.
The presentation in society of the Omega Project was carried out, an instance in which the Minister of Industry and the President of the Republic accompanied us.
-
CONTACTS BEGIN WITH THE IDB, CAF AND BROU.
The procedures for the financial engineering of the project are deepened.
-
THE PROCESS OF STUDY AND ANALYSIS OF THE OMEGA PROJECT BEGINS WITH THE IDB.
A process is initiated in which the IDB acts as the coordinating agency for the financing of the project.
-
PURCHASE PADRÓN 521 LINDERO TO THE CURRENT PLANT TO OPTIMIZE THE DESIGN OF THE NEW PLANT.
A new registry of the suburban area is attached to the current plant, to optimize the design of the project layout and minimize the works in the company’s registers that are located directly on the river, protected area Wetlands of Santa Lucia.
-
THE OMEGA PROJECT IS DECLARED OF MINISTERIAL INTEREST BY THE MEM.
-
ENVIRONMENTAL REPORT SUMMARY EFICE ADDENDUM.
The summary environmental report is given to DINAMA with the full explanation of the impact studies carried out on the project with its modifications.
-
THE OMEGA PROJECT IS ACCEPTED BY THE IDB.
After a year of interaction and processing of reports, the Omega Project is accepted by the Eligibility Committee at the IDB headquarters in Washington.
-
SIGNS FRAMEWORK CONTRACT WITH THE IDB.
-
SIGN CONTRACT WITH THYSSENKRUPP.
-
SPECIAL AUTHORIZATION DINAMA.
-
SIGN OF CREDIT CONTRACTS WITH THE IDB.
-
HOME CONSTRUCTION, LOCAL AND ABROAD FOR A PERIOD OF 2 YEARS.
Launch of the Omega project